BRIEF DESCRIPTION

EL NAQAB DAM is part of the project to improve infrastructure and
strategic facilities in Ras Al Khaimah. The dam is 22 meters high, 257 meters
wide, and can hold about one million cubic meters of water. It is located in
the main Negev Valley, 6 kilometers from the confluence of three valleys in
the Al-Fahlin area. Specific water channels with lined paths, lakes, and
barriers will be extended to absorb and store rainwater.

  • 3D Visualization
  • 3D Modeling civil works (Earth works-roads-signage – geotextiling – layering).
  • 3D Modeling structures works(champers – stairs – Dam crest -fence – culvert- stilling basins).
  • 3D Modeling MEP works (HDPE pipes – culvert valves-Chairs valve fixation).

AT A GLANCE

Project Type Bim
Owner ministry of energy and infructure
Contractor CHSS
BIM & 3D CONSULTANT perkel - apply and more
LOCATION United Arab Emirates

SCOPE OF WORK

  • 3D Visualization
  • 3D Modeling civil works (Earth works-roads-signage – geotextiling – layering).
  • 3D Modeling structures works (champers – stairs – Dam crest-fence – culvert- stilling basins).
  • 3D Modeling MEP works (HDPE pipes – culvert valves Chairs valve fixation).
© Copyright 2025 APPLY AND MORE Theme