- The Muzdalifah Lots at Train Stations 1, 2, and 3 project is a part of KIDANA’s urban and infrastructure development initiative aimed at optimizing the passenger experience and improving traffic flow during peak pilgrimage seasons.
- This development utilizes a Building Information Modeling (BIM) Level of Development (LOD) 300 standard to deliver a high-accuracy, data-rich digital representation of the project. The use of LOD 300 ensures that the model conveys precise geometry, placement, and specifications of each component, enabling seamless coordination among engineering, architectural, and construction teams.










